📞 Call Us Book a Demo 💬
🇦🇪 UAE — 30 MAY 2026 — ALL 7 EMIRATES — NO EXEMPTIONS 🇸🇦 KSA — TADAWUL ESG MANDATORY 🇴🇲 OMAN — MSX ESG MANDATORY 2025 🇶🇦 QATAR — QFC ISSB 2026 🇧🇭 BAHRAIN — CBB TCFD MANDATORY 🇰🇼 KUWAIT — CMA REGULATIONS 2026 ⚠ FINES: AED 50K–2M — DOUBLED FOR REPEAT OFFENCES ALL FREE ZONES — RAKEZ · AFZ · JAFZA · DMCC — BOUND
Federal Decree-Law No. 11 of 2024 — Mandatory Compliance

Every company in the UAE
must comply with
mandatory GHG reporting.

Live and operational — UAE companies including our own registered entities are actively using the platform to complete their 30 May 2026 federal compliance obligations.

The deadline is 30 May 2026. The law applies to every business in the UAE — mainland, all free zones, all seven emirates. Fines up to AED 2,000,000. METRIQOm® is pre-configured for every UAE and GCC regulatory requirement. Operational in days, not months.

Book a Demo → See the Platform
Time remaining to comply — 30 May 2026
--
Days
:
--
Hours
:
--
Mins
:
--
Secs
⚠ Non-compliance fine: up to AED 2,000,000 · No free zone exemptions · Licence suspension risk
The Platform

One control tower.
Every regulation.

17 ESG, EIA, and Supplier Intelligence modules unified in one platform — pre-configured for UAE Federal Law, all seven emirates, and all six GCC markets. No implementation project. Operational in days.

📊
GHG & Carbon Footprint
Scope 1, 2 & 3 inventory aligned to MOCCAE MRV platform and ISO 14064. UAE mandatory compliance tool for all emirates and free zones.
MANDATORY 2026MOCCAE MRVISO 14064
Energy Efficiency
Asset-level monitoring with up to 30% documented savings. ISO 50001 aligned. Barjeel RAK compliant. DEWA, ADDC and SEWA ready.
ISO 50001BARJEELDEWA
🌡
Climate Risk Management
TCFD and IFRS S2 aligned physical and transition risk assessment. ADX ESG disclosure ready. UAE and GCC climate scenarios built in.
TCFDIFRS S2ADX/DFM
💧
Water Management
Site-level tracking for UAE water stress context. ISO 46001. Permit compliance for DEWA, ADDC, and SEWA. Gulf-specific benchmarks built in.
ISO 46001UAE STRESS
🌿
ESG & CSRD Reporting
GRI, ESRS, ADX/DFM, GHG Protocol. Audit-ready with full evidence trail. External assurance support. Arabic language reporting included.
GRIADXDFMCSRD/ESRS
🤖
AI Supplier Intelligence
Claude AI · 47-dimension UAE/GCC matrix · 0–100 scoring · AI document evidence review. OECD aligned. The only platform with this capability for GCC.
CLAUDE AI47-DIMENSIONOECD
🦺
HSE Management
ISO 45001, OSHAD SF, Dubai OSH Law. TRIR and LTIFR auto-calculated. Contractor control and incident tracking for UAE operations.
OSHADISO 45001DUBAI OSH
🗺
EIA & Environmental
Full EIA workflow for UAE, KSA, Oman, Qatar. IFC Performance Standards. Contamination screening. The only platform with integrated EIA globally.
UAE EIAIFC PSKSA · OMAN
🔗
Supply Chain Governance
Continuous compliance tracking. Scope 3 from supply chain. LkSG, CS3D, OECD due diligence. SAP/ERP compatible. ARAMCO supply chain ready.
SCOPE 3OECDARAMCO
View All Solutions
GHG Inventory & Third-Party Verification

ISO 14064-aligned.
Verification-ready from day one.

METRIQOm® produces a complete, traceable GHG inventory structured for regulatory submission and third-party verification — so you are never caught unprepared as obligations expand.

📋

ISO 14064-Aligned GHG Inventory

METRIQOm® produces a complete GHG inventory with all calculation methodologies, emission factors, activity data, and assumptions fully documented and traceable — structured and ready for third-party verification when required.

What this means for you: Every data point is auditable. Every assumption is recorded. Every emission factor is sourced and cited. Your GHG report is not just compliant — it is defensible.

ISO 14064GHG PROTOCOLSCOPE 1 & 2AUDIT TRAILMOCCAE MRV
All Seven Emirates

Your emirate.
Your obligations.

Federal law binds every company in every emirate. But Abu Dhabi, Dubai, RAK and others each have additional requirements on top. METRIQOm® is pre-configured for all of them.

🏙 Abu Dhabi
+ EMIRATE-SPECIFIC LAWS
  • EAD Environmental Permits
  • Estidama Pearl (min. Pearl 1)
  • OSHAD SF occupational safety
  • ADNOC supply chain standards
  • ADGM FSRA climate disclosure
🌆 Dubai
+ EMIRATE-SPECIFIC LAWS
  • Dubai Municipality env. regs
  • Al Sa'fat Green Building (Silver+)
  • Dubai OSH Law No. 8 of 2016
  • Trakhees permit compliance
  • DIFC / DFSA sustainability
🏔 Ras Al Khaimah
MOST ADVANCED N. EMIRATE
  • Barjeel Green Building — mandatory
  • RIS 2050 — Amiri Decree No. 8 of 2025
  • RAK EE&R Strategy 2040
  • EPDA environmental permits
  • RAKEZ sustainability requirements
🏭 Sharjah
+ FEDERAL LAW
  • EPAA environmental regulations
  • Sharjah Sustainable City
  • SAIF Zone / Hamriyah FZ compliance
🏗 Ajman
+ FEDERAL LAW
  • Ajman Municipality env. regulations
  • Ajman Sustainable District
  • AFZ sustainability — 17,000+ companies
Fujairah
+ FEDERAL LAW
  • Fujairah Municipality env. regs
  • Clean Energy Industrial Zone
  • Port of Fujairah Green Program
🌿 Umm Al Quwain
+ FEDERAL LAW
  • UAQ Municipal environmental regs
  • Eco-Housing Pilot Programme
  • Federal GHG reporting obligation
🏢 All Free Zones
NO EXEMPTIONS UNDER FEDERAL LAW
  • AFZ · RAKEZ · JAFZA · DMCC
  • DIFC · ADGM · KIZAD · SAIF
  • Masdar City · Fujairah FZ · UAQ FZ
GCC Markets

One platform.
Six GCC markets.

Every GCC country now has active or imminent ESG obligations. METRIQOm® is the only platform pre-configured for the full GCC regulatory landscape without customisation.

🇦🇪
UAE
MANDATORY

All entities · 30 May 2026 · AED 2M fine

🇸🇦
Saudi Arabia
MANDATORY LISTED

Tadawul ESG · Saudi Green Initiative

🇴🇲
Oman
MANDATORY

MSX Jan 2025 · CBO TCFD mandatory

🇶🇦
Qatar
QFC ISSB 2026

QSE Premier · QFMA Governance

🇧🇭
Bahrain
MANDATORY BANKS

CBB TCFD · Bahrain Bourse ESG

🇰🇼
Kuwait
2026 FORMAL

CMA Kuwait · Boursa Kuwait ESG

Why METRIQOm®

Built for this market.
Ready for this deadline.

Every other ESG platform was built for Europe or North America and adapted for the GCC. METRIQOm® was designed from the ground up for UAE and GCC regulatory requirements.

01

GCC-native. Not adapted. Built here.

Emirate-level licensing matrices, MOCCAE MRV alignment, OSHAD, Estidama, Barjeel, ADX/DFM disclosure, ARAMCO supply chain standards — all built in, not bolted on. No other platform offers this depth of GCC configuration.

47-DIMENSION UAE/GCC MATRIX
02

AWS Nitro Enclave security. Unmatched in the market.

METRIQOm® runs on AWS Nitro Enclave isolation — a cryptographically sealed compute environment where no one, including METRIQOm staff and AWS engineers, can access your data. The same infrastructure class used by financial services and defence.

CRYPTOGRAPHIC ISOLATIONNO OPERATOR ACCESS
03

Claude AI evidence review. Not just file upload.

Most supplier platforms check whether a document was uploaded. METRIQOm® uses Claude AI to check whether the document is actually valid — reviewing every certificate for relevance, scope, expiry, and compliance. AI-generated 0–100 supplier risk scores across 47 compliance dimensions.

CLAUDE AITRANSPARENT REASONING
04

Operational in days. Not months.

SAP Sustainability Cloud takes 6–9 months to implement. EcoVadis requires a full procurement process. METRIQOm® is pre-configured — your first GHG report can be produced within a week of activation.

FIRST REPORT IN UNDER A WEEK
AWS Nitro Enclaves

Enterprise security.
Government-grade.

Standard SaaS platforms store your ESG data in shared cloud environments accessible to vendor staff. METRIQOm® processes your data in an AWS Nitro Enclave — a mathematical guarantee of privacy.

🔐
No METRIQOm staff accessCryptographic isolation prevents all internal access
☁️
No AWS engineer accessHardware-sealed environment, no cloud vendor exceptions
Cryptographic attestationMathematically verifiable, not a policy claim
🇪🇺
GDPR compatiblePasses every enterprise IT security review
🏛
Financial services gradeSame infrastructure class as defence and banking
🔒

AWS Nitro Enclave

Your GHG figures, supplier compliance data, and ESG disclosures are sealed from all external access. This is not a policy claim. It is a mathematical guarantee.

The deadline is 30 May 2026

Start today.
No exceptions. No extensions.

Whether you are in Abu Dhabi, Dubai, Sharjah, Ajman, RAK, Fujairah, or Umm Al Quwain — the obligation is the same. METRIQOm® closes every compliance gap in one platform, operational within days.

📞 CALL US 💬